Managed-Flow Echo System, 2005

Site-specific installation, Turchin Center for the Arts, ASU, NC
Commission

Water, plastic tubing, pumps, containers found on site, aquatic plants, PVC pipe, electrical cords, mirror, sink found on site
Dimensions vary

This piece is comprised of seven inter-connected and inter-dependent systems that re-circulate about 300 gallons of water per hour. Strategic drips with in the system direct water to sustain aquatic plants. Evaporation is re-fortified by collecting drips from the sink in the womens' bathroom.


























Press